|
973.377.6500
One Kings Road | Madison, NJ 07940
|
![]() ![]() |
|
|
|
|
Keep Up With the Latest at Adams DentalWe’ve created this page to keep our patients updated on news at our office, events that we think you might find interesting and even our patients in the news. If you have something you’d like posted here, please contact us. Office Renovation September 10, 2011 – So, things are finally shaping up at the new office. The weather (Hurricane Irene) has been delaying some outside work, but work continues to progress inside the building. June 26, 2011: For anyone who has driven by the building on Kings Road, you should have noticed lots of work being done outside. Many friends have asked me what is taking so long and why we took down the garage, so I thought I’d give an overview to answer some questions. We spent about seven months getting variances approved for the building. It’s long, annoying and expensive and anyone who has done construction (in Madison) may share the frustration I’ve had with the illogical process. The main reason for the variances stemmed from parking. While the former Red Cross had an entrance on the right and a “borrowed” exit on the left that belonged to the Board of Education, the use of the exit did not transfer to me. I had to come up with a plan that would not utilize the Board of Education’s property. Our demo permit was recently issued, and my father and his friend, John Forte, of Forte Demolition, made quick work of removing the garage and widening the driveway on the right so that it can be both entrance and exit. We will need to build retaining walls on either side of the property and level the driveway, eventually having enough parking for 15 cars. At this point, we are at a standstill; still waiting for the interior building permit before we can begin. The plan calls for changing most of the first floor walls and updating all the plumbing, electric and heating systems. Once work has begun, I’ll post some pictures to show the progress. While this process has been MUCH longer than anticipated, we (Andrea, Kelly, Jackie and myself) are so excited about the final product that we’re willing to wait a bit longer. Our hope is to be in by September – back to school for some and hopefully, back to work for us! May 24, 2011: We’ve finally closed on the new building at One Kings Road in Madison (the former Red Cross building)! We are looking forward to starting construction within the next month and hope to be in the new space by August. Keep checking back to this page as we keep you updated on our progress.
|
|
|
|
|





















